Home > Exhibition > Content

Reasonable distribution of purification workshop and requirements for wall ceiling

Nov 14, 2018

We should know that a reasonable distribution workshop can achieve a good energy saving effect. A more widely used method of distribution is to arrange the purification workshop in the corridor. At the same time, in order to ensure the role of purification, it is better to use double-decked windows outside the corridor, so that the tightness will be very good. Or directly distribute the purification workshop outside the corridor, so as to prevent the low cleanliness of the corridor and the impact on the purification of the workshop.

 

The space can also be divided into two parts, one is used as a purification workshop, the other is used as a separate area. There is also a step-by-step method to purify the role of the workshop, that is, to place the purification workshop in the center, and then distribute other auxiliary areas nearby. In this way, it can prevent the adverse impact of outdoor climate on the purification workshop, so as to make the energy consumption of the purification workshop more stable.

 

After the distribution of the purification workshop is determined, the walls and roofs should be reddishly designed. Their surfaces should be flat, smooth, dustproof, avoid glare, facilitate dust removal, and should reduce concave and convex surfaces. Kicking should not highlight the walls; the walls should not be plastered by masonry walls; drying and plastering should be adopted in the purification workshop. Adopt advanced plastering standard. After plastering, the wall should be painted, and the non-flammable, non-cracking, anti-cleaning, smooth surface, not easy to absorb water, deteriorate and mildew paint should be selected.http://www.wxrfcleanroom.com/