Selection Principles of Decoration Materials for Purification Workshop

Aug 08, 2019

The next step is the decoration construction of the purification workshop project. In this process, the selection of materials is a very important process. If the materials do not meet the engineering requirements, the quality of the whole purification workshop project will be affected. How to choose the materials in the decoration of the purification workshop?

 

When decorating the purification workshop, it is necessary to prepare air duct materials, purified color steel plate materials and clean floor materials, which meet different requirements. As for the selection of air duct materials, the cleanliness level required in general cleaning workshop engineering is C level, and the local level is A or B level, which requires the selection of galvanized steel sheets with better quality and performance as air duct materials for cleaning workshop engineering.

 

And learn to distinguish between good and bad materials, should choose galvanized layer uniform, no obvious oxide layer, no pinholes, pitting, peeling, foaming and galvanized layer falling off high-quality board; and purification workshop engineering wind pipe external insulation is generally rubber-plastic insulation, smoke prevention and exhaust system wind pipe is glass wool insulation.

 

In order to meet the requirement that the dust is not easy to accumulate in the cleaning workshop project, its enclosure structure should adopt the non-combustible purified color steel plate, and require the plate to meet the characteristics of corrosion resistance, non-dust accumulation, good smoothness, high strength and good sealing effect, so the 50 and 100 type metal wallboards are mostly used.

 

The ceiling panel material in the purification workshop project is polyester coated color steel plate, and the magnesia plate 5 mm thick should be added to its interior. Only by strengthening the structure and lifting firmly, can the maintenance personnel meet the walking load on the ceiling of the purification workshop project.

 

The rest is to choose the clean floor materials for the decoration of the purification workshop. Generally, the structure of epoxy mortar self-flow floor and PVC floor is chosen. Therefore, epoxy resin, curing agent, inorganic pigments, as well as PVC and its copolymer resin, filler, plasticizer, stabilizer, colorant and other accessories should be prepared.https://www.wxrfcleanroom.com/